Turning Circle at Advanced Supply Chain

Service Areas
Civil & Groundworks Civil & Groundworks

The Brief:

New turning circle required for HGV manoeuvrability

Advanced Supply Chain needed a reinforced concrete turning circle at their Corby site to improve lorry movements and reduce surface wear in a high-traffic area.

Our Approach:

Excavation, sub-base, and reinforced concrete installation

The objective was to improve HGV manoeuvrability and reduce wear and tear on existing surfacing in a high-traffic area.

To ensure safety and maintain operational flow, the work area was securely barriered off. Our team carried out excavation to the required depth, followed by sub-base preparation and formwork installation. We then poured and finished a high-strength concrete slab, suitable for regular HGV use, with the necessary curing time factored into the programme.

All works were delivered in accordance with site-specific health and safety protocols and with minimal disruption to daily operations.

The Outcome:

Durable surface improving traffic flow and reducing wear

The new turning circle provides a durable, low-maintenance surface that improves vehicle movement efficiency on site. The project was completed on time, to specification, and with a clean finish that met the client’s operational and safety requirements.

Share this case study

Get your FREE no obligation quote today

    Our Accreditations & Approvals

    Take a closer look at some of our other work