Concrete Base Installation for Diesel Tank
Fortis Construct designed and installed the base, starting with a full site assessment.
Fortis Construct designed and installed the base, starting with a full site assessment.
We completed a full EV charging installation at a public site, helping meet the rising demand for accessible, reliable electric vehi…
Our team undertook excavation, ducting, and trenching works to prepare the site for incoming power supplies and EV charger bases.
Our team carefully excavated the designated areas, installed heavy-duty ducting to specification, and ensured all services were correctly positioned and protected.
Our team carried out excavation to the required depth, followed by sub-base preparation and formwork installation.
The works provided a fully prepared and connected infrastructure for the installation of EV chargers, supporting Charged EV’s expansion of accessible, public charging points.
Bubble Design, a fast-growing creative agency, approached Fortis Construct with a need to enhance access control and improve…