The Brief:
Excavation and ducting required for infrastructure upgrade
Charged EV required ducting works at Peabody Estate, Hammersmith, as part of wider infrastructure upgrades. Works needed to be precise while maintaining safe access for site users.
Our Approach:
Careful excavation, ducting install, and surface reinstatement
Fortis Construct was tasked with completing the excavation of existing tarmac surfacing to facilitate the installation of new underground ducting at Peabody Estate. The works formed part of a broader infrastructure upgrade, requiring precise execution to maintain access and minimise disruption.
Our team carefully excavated the designated areas, installed heavy-duty ducting to specification, and ensured all services were correctly positioned and protected. Once installation was complete, we reinstated the tarmac using high-quality materials, compacted and finished to match the existing surface levels and ensure a seamless, durable result.
Throughout the project, we prioritised health and safety, maintaining clear signage and barriers to protect site users and the public.
The Outcome:
Seamless, durable finish delivered on schedule
The project was delivered on schedule with a clean and professional finish. The installed ducting provides a reliable route for future utilities or cabling, and the reinstated tarmac restored full functionality to the area with minimal visual impact. The client praised the quality of the workmanship and the smooth delivery of the job from start to finish.