The Brief:
EV infrastructure works required at Telferton car park
Charged EV needed ducting and a pre-fabricated kiosk installed to support the rollout of EV charging facilities at a Telferton site.
Our Approach:
Excavation, ducting, kiosk installation, and reinstatement
Fortis Construct was appointed by Charged EV to deliver essential groundwork and infrastructure installation to support new electric vehicle (EV) charging facilities at a car park of one of their client’s in Telferton.
The scope included excavation and installation of underground ducting for power cabling, along with the positioning and securing of a pre-fabricated kiosk that will house EV charging control equipment. Our team carried out the works with careful planning to minimise disruption to car park operations, maintaining access for vehicles and pedestrians throughout.
Trenches were excavated to precise depths, ducting installed and tested, and reinstatement carried out using matching materials to ensure a clean and professional finish.
The Outcome:
Prepared site ready for EV charging rollout
The project delivered a fully prepared site, ready for charger installation, with clean and efficient execution.